
From the U.S. Code Online via GPO Access
[wais.access.gpo.gov]
[Laws in effect as of January 2, 2001]
[Document not affected by Public Laws enacted between
  January 2, 2001 and January 28, 2002]
[CITE: 16USC346a-3]

 
                         TITLE 16--CONSERVATION
 
   CHAPTER 1--NATIONAL PARKS, MILITARY PARKS, MONUMENTS, AND SEASHORES
 
                 SUBCHAPTER XXXVIII--ZION NATIONAL PARK
 
Sec. 346a-3. Exchange of lands; construction of interchange

    The Secretary of the Interior is authorized to convey to the Utah 
State Road Commission under such terms and conditions as he may deem 
necessary such lands or interests in land in lot 3, section 29, township 
38 south, range 12 west, Salt Lake meridian, containing approximately 
four and one-half acres, as are required by the Commission for the 
realinement and construction of United States Highway 91: Provided, 
That, in exchange, the State of Utah constructs an interchange of 
design, type, and location acceptable to the Secretary which will 
provide vehicular access between the said highway and Zion National 
Park. Such conveyed lands shall thereafter be considered as excluded 
from the Zion National Park and the easterly right-of-way line of United 
States Highway 91, identified as project numbered I-01-1(1), Washington 
County, Utah, shall become the westerly boundary of the Zion National 
Park in lot 3, section 29, township 38 south, range 12 west, Salt Lake 
meridian.

(Pub. L. 86-387, Sec. 3, Feb. 20, 1960, 74 Stat. 5.)
